1981 till TODAY : COMPANY HISTORY AND MILESTONES

BGS Beta-Gamma-Service GmbH & Co KG was founded by Dr. Lothar Wiesner in Wiehl near Gummersbach in 1981. His business idea was to offer the innovative and advantageous irradiation technology as a first-class service in line with customer requirements. After two years of construction, the first two electron accelerators were put into operation in 1983.

Through constant growth and our dynamic willingness to invest, our company has developed over the years into Germany’s largest provider of irradiation services. Today, BGS operates two gamma plants and eight electron accelerators at three strategically located sites in Germany (Bruchsal near Karlsruhe, Saal a.d. Donau and Wiehl near Cologne) and employs more than 200 people. Thanks to the targeted expansion of the plants, services can be offered uniformly at all locations, which improves logistics and flexibility for customers and enables faster throughput times.

BGS is owned by the Kotz (Wiehl) and Fissler (Idar-Oberstein) families. Dr. Andreas Ostrowicki has headed the company as Managing Director since 2008.

A bird's eye view of the production building from above

1981: COMPANY
FOUNDATION

Under the management of Dr. Lothar Wiesner, BGS is founded in the new industrial area of Wiehl (North Rhine-Westphalia) with seven employees. His idea: to establish a service company for radiation technology. Right from the start, BGS is one of the few companies to offer both radiation sterilization and radiation crosslinking.

Black and white photo with a man and an electron accelerator

1983: PIONEERING TIME WITH TWO ACCELERATORS

Two years later, the first two electron accelerators (0.56 MeV and 2.8 MeV) are put into operation. At this time, BGS has ten employees. The beginnings are difficult, the innovative technology is still little known. The first customers come from the fields of medical technology and the cable and hose industry.

Graues Gebäude mit BGS Aufschrift
BGS Historie 1986

1986: FIRST GAMMA PLANT AND SECOND LOCATION

In 1986, the first cobalt-60 gamma irradiation plant is built in Wiehl. BGS thus expands the field of radiation sterilization, particularly of medical technology and packaging for food and pharmaceutical products – demand is now growing rapidly. In the same year, the Bruchsal (Baden-Wuerttemberg) site is founded with the purchase of a 4.5 MeV accelerator.

Gebäude Komplex Ansicht von oben
BGS Historie 1997

1997: COMMISSIONING OF THE NEW GAMMA PLANT

In Wiehl, the new 5 MCi cobalt-60 gamma plant is put into operation and the storage area for non-irradiated and irradiated products is expanded. The old gamma plant is converted and space is created for a 2.5 MeV electron accelerator. At this time, the management had already been in the hands of Dr. Alfred Zyball, who holds a doctorate in physics, for seven years.

Gebäude in Saal von oben
BGS Historie 2000

2000: SAAL BECOMES THIRD LOCATION

BGS continues to expand: Saal a.d. Donau (Bavaria) is added as a third location in 2000. Here, the company operates a modern 10 MeV electron accelerator for the highly automated irradiation of piece goods. BGS now employs a total of 71 people. The administration building at the headquarters in Wiehl needs to be extended.

Große Halle mit Anlagen und einer großen Kassette die sich bewegt
BGS Bruchsal hast die weltweit größte bestrahlbare Fläche

2002: NEW CONSTRUCTION 10 MEV ELECTRON
ACCELERATOR

The construction of a new 10 MeV electron accelerator starts at the Bruchsal site. The special feature of this plant is that parts measuring up to 12.0 m x 1.60 meters can be irradiated here – the largest irradiable area in the world to date!

Zwei Männer mit Hemd und Krawatte
BGS Historie 2008

2008: NEW MANAGEMENT

After 18 years, Dr. Alfred Zyball hands over the management of the company to Dr. Andreas Ostrowicki. The doctor of chemistry continues to modernize the company, introduces industrial processes and standards and makes it an important service provider for customers from around 30 countries.

Elektronenbeschleuniger mit grünem Hauptelement und schwarzem Gerüst
BGS Historie 2009

2009/2010: NEW CONSTRUCTION 5 MEV ELECTRON
ACCELERATOR

A new 5 MeV accelerator for irradiating cables, pipes and hoses is built at the Saal a. d. Donau site in 2009. The accelerator goes into operation a year later. At the same time, the logistics area is expanded to approx. 8,800 square meters.

sechs Tore an einer Logistikhalle
BGS Wiehl LKW Ladebereich

2012/2013: EXPANDED LOGISTICS SPACES IN WIEHL

Warehouse space is also becoming scarce in Wiehl, so BGS is building a new logistics center for sterile products at its headquarters. In addition, new ERP software for complete process integration will be introduced at all three sites in 2013.

Maschinensystem verlädt Kartons
BGS Saal Historie 2014

2014: NEW HANDLING SYSTEM DOUBLES CAPACITY

An advanced handling system with a high throughput rate for the automated handling of packaged products is installed in Saal. This measure enables the plant capacity to be doubled. One year later, a new 3.0 MeV multipurpose accelerator with an output of 150 kW is installed in Wiehl. The system creates additional irradiation capacity for drums and cardboard packaging.

blaue strahlende Stäbe nebeneinandergereiht

2018: MOST MODERN GAMMA PLANT GOES INTO OPERATION

After a construction period of just one and a half years, the new 6 MCi cobalt-60 gamma system including the highly automated logistics center is inaugurated at the Bruchsal site – the largest project in the history of BGS to date with an investment of around 15 million euros. The world’s most modern gamma system at the time can process up to 80,000 pallets of sterile goods per year.

Open Works Space Büro innenansicht
BGS Verwaltung

2019/2020: NEW ADMINISTRATION BUILDING IN WIEHL

In summer 2020, after two years of construction, the new administration building with open space and state-of-the-art IT equipment at the headquarters in Wiehl are ready to be moved into. Cross-divisional communication and flexible working from anywhere are now part of daily work processes.

Gabelstapler transportiert in Lagerhalle Palette
BGS Bruchsal Historie 2020

2020: EXPANDED LOGISTICS SPACES IN BRUCHSAL

BGS remains on course for growth during the pandemic and launches the construction of new logistics space for sterile goods at the Bruchsal site. The new hall will create 2,700 square meters of new storage space, more than doubling the previous storage space.

drei Auszeichnungen mit Schrift 100 Top Innovator auf Tisch

2021: 40 YEARS OF BGS AND TOP 100-INNOVATOR

With now more than 190 employees, BGS celebrates its 40th anniversary in summer 2021. In the same year, the company receives the TOP 100 Award for innovative strength and success for the third time in a row and organizes the Irradiation Service Days, the first virtual trade fair for radiation sterilization and radiation crosslinking topics.

Labor Gerät Hot Set Test
BGS Hot Set Test

2023/2024: HALL EXTENSION AND LABORATORY EXPANSION

Work begins on the expansion of logistics and production at the Wiehl site. Around 1,000 square meters of new space will be created. At the same time, planning begins for the construction of a new laboratory with state-of-the-art plastics testing and measuring technology – scheduled for completion in 2024.